| |
151. |
Design and engineering for precipitator and thickener for Tayan Alumina Project. Scope of work : Strength calculation, assembly drawing, detail drawing, cutting pland and as built drawing. |
|
Artawa Indonesia |
|
| |
150. |
Design, manufacturing and installation of Plat form for OM turning machines. |
|
Komatsu Undercarriage Indonesia |
|
| |
149. |
Engineering, procurement / manufacturing, installation work, test and commissioning for bag filter, scruber, tank, carbon absorber tank and other equipments for PT. Perdic ( Chemical plant ) |
|
SEAMEC Asia |
|
| |
148. |
Engineering and procurement / manufacturing of rotary valve for cement plant at Brunei Darussalam |
|
Butra Heidelberg Cement Brunei |
|
| |
147. |
Partial design, procurement / manufacturing, test & inspection, packing and transportation for Tank & pot for the model project for ethanol production from molasses, NEDO − PTPN X Mojokerto |
|
Tsukishima Kikai Co., Ltd |
|
| |
146. |
Procurement and installation of mechanical and electrical for Moriseiki NL2500/700 machine |
|
Komatsu Undercarriage Indonesia |
|
| |
145. |
Procurement and insttalation of roller for furnace No. 3 System |
|
Komatsu Undercarriage Ind |
|
| |
144. |
Engineering, procurement and installation of electrical and instrument system for modification limestone silo to cement silo, including integrated programming to existing control system. |
|
Semen Baturaja |
|
| |
143. |
Engineering, procurement and insattaltion of foundation work for AOP tank and control room |
|
Aneka Tambang Unit Pongkor |
|
| |
142. |
Engineering, procurement / manufacturing, installation, test and commissioning forconveyor system for oversize ball mill material |
|
Aneka Tambang Unit Pongkor |
|
| |
141. |
Engineering, procurement / manufacturing, test and inspection, packing and delivery of Steam Processing Kettle ( pressure vessel ). |
|
Bio Greenland |
|
| |
140. |
Engineering and procurement for load cell for bagging system, |
|
CCM Agripharma |
|
| |
139. |
Supply lubricating oil, pneumatic tool engine and lubricating for mitsubishi enginee diesel. |
|
Cibaliung Sumberdaya |
|
| |
138. |
Engineering, procurement / manufacturing, test and inspection, packing and delivery and installation supervising for JCF Project, coal liquefaction pilot plant project, NEDO − JGC |
|
JGC Indonesia |
|
| |
137. |
Maintenance service Mitsubishi diesel engine No. 1 and No. 2 |
|
Cibaliung Sumberdaya |
|
| |
136. |
Engineering, procurement,installation, test and commissioning for transformer 52 KVA for new furnace |
|
Komatsu Undercarriage Indonesia |
|
| |
135. |
Fabrication Equipment Bin & Chute for Expansion Cement Tonasa No. V |
|
Semen Tonasa |
|
| |
134. |
Engineering, procurement and installation, test and commissioning for high voltage panel for water intake |
|
Aneka Tambang unit Pomalaa |
|
| |
133. |
Procurement of accessories and installation of HMC machine and OM tuning machine Engineering, procurement, installation, test and commissioning transformer 150 KVA |
|
Komatsu Undercarriage Indonesia |
|
| |
132. |
Maintenance service Mitsubishi diesel engine No. 3 |
|
Cibaliung Sumberdaya |
|
| |
131. |
Supply of Feed Box & Cone Section Set Mill Cyclone Plant |
|
Aneka Tambang Unit Pongkor |
|
| |
130. |
Engineering and procurement of furnace acessories and furnace installation |
|
Komatsu Undercarriage Indonesia |
|
| |
129. |
Repairing and maintenance of PE Tank |
|
Maruhachi Indonesia |
|
| |
128. |
Engineering, procurement / manufacturing, installation, test and commissioning for recondition of 8 sets filter basin |
|
PT. Aetra Air Jakarta |
|
| |
127. |
Installation of bearing and chain conveyor for bucket elevator system |
|
Lautan Otsuka Chemicals |
|
| |
126. |
Engineering, procurement and installation of exhaust fan for gold room |
|
Cibaliung Sumberdaya |
|
| |
125. |
Supply moly gear 1500 spray 420 mL, oil seal, switch zero speed |
|
Coral Bay Nickel Corporation |
|
| |
124. |
Supply of shield water cooled FeNi #1, #2, #3 |
|
PT. Aneka Tambang Unit Pomalaa |
|
| |
123. |
Engineering, procurement / manufacturing, installation, test and commissioning agitator and classifier unit for limestone plant. |
|
PT. Kapurindo Sentana Baja |
|
| |
122. |
Engineering, procurement / manufacturing, installation, test and commissioning jib crane and monorail |
|
PT. Cibaliung Sumberdaya |
|
| |
121. |
Recondition shaft trunnion discharge ball mill |
|
PT. Aneka Tambang Unit Pongkor |
|
| |
120. |
Maintenance of waste water system |
|
PT. NBC Indonesia |
|
| |
119. |
Engineering, procurement, installation, test and commissioning for renewal / refurbishment of mechanical and electrical of scrapper unit. |
|
PT. Aetra Air Jakarta |
|
| |
118. |
Engineering, procurement / manufacturing, installation, test and commissioning for chain conveyor system & screw feeder |
|
PT. Tifico |
|
| |
117. |
Engineering, procurement, installation, test and commissioning for diesel power plant 3 x 1.5 MW |
|
PT. Cibaliung Sumber Daya |
|
| |
116. |
Supply of motor of SAG mill 1.400 KW |
|
PT. Cibaliung Sumber Daya |
|
| |
115. |
Engineering, procurement / manufacturing, installation, test and commissioning drum crusher and blade |
|
PT. Tifico |
|
| |
114. |
Manufacturing, inspection and test, packing and delivery retort of drying kiln and rotary rotary cooler |
|
PT. NX Indonesia |
|
| |
113. |
Supply / manufactuiring one unit electro wining cell storage |
|
PT. Aneka Tambang Unit Pongkor |
|
| |
112. |
Supply / manufacturing and installataion of gravity concentration circuit |
|
PT. Aneka Tambang Unit Pongkor |
|
| |
111. |
Supply / manufacturing and installation shaft agitator and air dispenser |
|
PT. Aneka Tambang Unit Pomalaa |
|
| |
110. |
Recondition electro wining cell storage #1 and #4, plant #2 |
|
PT. Aneka Tambang Unit Pongkor |
|
| |
109. |
Engineering, procurement / manufacturing, installation, test and commissioning for coater drum RFO PF II |
|
PT. Petrokimia Gresik |
|
| |
108. |
Engineering, procurement / manufacturing, inspection, packing and delivery of shaft screw spiral classifier |
|
PT. Aneka Tambang Unit Pomalaa |
|
| |
107. |
Engineering, procuremen / manufacturing, installation, test and commissioning for reclaiming and bagging system for NPK product. |
|
PT. CCM Agripharma |
|
| |
106. |
Engineering, procurement / manufacturing, installation, test and commissioning for rock phosphate grinding mill for NPK fertilizer plant |
|
PT. CCM Agripharma |
|
| |
105. |
Supply of material, manufacturing, installation, test and commissioning for new line hydrant |
|
PT. Tanjung Enim Lestari |
|
| |
104. |
Supply seal shaft, carbon and rubber / coral, belt cleaner assy, carbon scrapper |
|
JGC - Philippines |
|
| |
103. |
Modification work for Toyota ringhood and ducting |
|
Nippon Metal − Japan |
|
| |
102. |
Manufacturing of SWGR steel structure for Wayang Windu Geothermal Power Plant |
|
Moritani & Co.Ltd |
|
| |
101. |
Repairing plate elution Columb plant #1 |
|
PT. Aneka Tambang Unit Pongkor |
|
| |
100. |
Fabricate of electro winning cell plant storage |
|
PT Aneka Tambang Unit Pongkor |
|
| |
099. |
Engineering, procurement / manufacturing, installation, test and commissioning for AZ ultra plant 3 expansion line. |
|
PT. Lautan Otsuka Chemicals |
|
| |
098. |
Rail replacement |
|
PT. Asian Isuzu Casting |
|
| |
097. |
Manufacturing / procurement, installation, test and commissioning for dust collecting system |
|
PT. Toyota Motor manufacturing Indonesia |
|
| |
096. |
Engineering, procurement / manufacturing, installation, test and commissioning Yamaha Waste Water Treatment Plant project |
|
PT. Ebara Prima Indonesia |
|
| |
095. |
Engineering, procurement / manufacturing, installation,test and commissioning bucket elevator and screw conveyor |
|
PT. Lautan Otsuka Chemicals |
|
| |
094. |
Engineering, procurement / manufacturing, test and inspection for net conveyor, bag filter, mixer, screw conveyor, rotary valve, slide gate for UBC demonstration plant project. |
|
Kobe Steel, Ltd - Japan |
|
| |
093. |
Procurement and manufacturing of pipe shoe hot dip galvanized |
|
PT. Krakatau Engineering |
|
| |
092. |
Engineering, procurement / manufacturing, test and inspection for fly ash handling system for EP 1 & 2 |
|
PT Sentra Usaha Tama Jaya |
|
| |
091. |
Engineering, procurement / manufacturing, test and inspection for fly ash handling system for EP |
|
PT Styrindo Monorer |
|
| |
090. |
Design and engineering thickener |
|
Korean Chemical Co.,Ltd |
|
| |
089. |
Design and engineering of new hydrant pipe system |
|
PT Tanjung Enim Lestari
|
|
| |
088. |
Installation Work for Heavy Oil Kiln Burner |
|
PT Tanjung Enim Lestari
|
|
| |
087. |
Installation and Construction of 1000 kVA Generator |
|
PT Adiwira Presisi Industri |
|
| |
086. |
Supply of 1000 kVA Generator |
|
PT Adhiwira Presisi Industri |
|
| |
085. |
Engineering & Design of the modification to the receiving, storing, and burning system for use of heavy oil for the lime kiln |
|
PT Tanjung Enim Lestari |
|
| |
084. |
Engineering, supply material & manufacturing of adsorption & balancing tank for PSA oxygent plant |
|
Showa Environmental System Co,.Ltd |
|
| |
083. |
Fabrication of top casing for disc chipper |
|
PT. Tanjung Enim Lestari |
|
| |
082. |
Engineering, supply material & manufacturing, test, inspection, packing and delivery of trommel for granite stone for Bintan project |
|
Otsuka Iron Works., Ltd |
|
| |
081. |
Manufacturing / procurement, installation, test and inspection of dust collecting system |
|
PT. Komatsu Indonesia |
|
| |
080. |
Partial engineering of charging forklift, manufacturing of Furnace and charging forklift, installation, test and inspection. |
|
PT. Komatsu Indonesia |
|
| |
079. |
Fasibility Study and cost estimation of UBC demo plant (600T/D) |
|
KOBE STEEL.,LTD |
|
| |
078. |
Engineering, procurement / manufacturing, installation, test and commissioning fot high efficiency of coal preparation system |
|
Nagata Eng Co., LTD / Yamamoto Industries, LTD |
|
| |
077. |
Engineering, procurement / manufacturing, test and inspection for drum & vessel for SAK-II Singapore project |
|
MORITANI/HPC |
|
| |
076. |
Supply of vibrating feeder and installation for waste water treatment plant |
|
PT. NBC Indonesia |
|
| |
075. |
Partial engineering ( conveyor, drier, water treatment plant, slag treatment and others), procurement / manufacturing of equipment for system1,2,3,4 ), test and inspection, installation supervising for Nickel 3 (Fe-Ni 3) plant expansion project |
|
Kawasaki Plant System |
|
| |
074. |
Engineering, procurement / manufacturing, test and inspection for H2S scrubber system for Rio Tuba nickel project |
|
JGC Yokohama |
|
| |
073. |
Replacement ( manufacturing new section and installation ) of retort of roasting kiln |
|
PT. SUMIMAGNE UTAMA |
|
| |
072. |
Partial engineering, partial manufacturing and installation of equipment for pilot plant upgrading brown coal (UBC) project |
|
PT. TEKMIRA / KOBE STEEL |
|
| |
071. |
Manufacturing of equipment for TPF Project |
|
PHS Plant |
|
| |
070. |
Engineering, procurement, installation test and commissioning rotary kiln |
|
PT. MAP - I |
|
| |
069. |
Engineering, procurement / manufacturing, test and inspection cyclone |
|
PT. Indocement Tunggal Perkasa |
|
| |
068. |
Supply of emergency generator for upgrading brown coal pilot project. |
|
Shinko Plant Engineering Co. Ltd |
|
| |
067. |
Procurement and manufacturing of structure for upgrading coal pilot plant project |
|
Shinko Plant Engineering Co. Ltd |
|
| |
066. |
Design & engineering, procurement / manufacturing of test and inspection for material handling and crushing machine for lime stone crushing plant for Rio Tuba Nickel HPP project |
|
JGC - Yokohama |
|
| |
065. |
Design & engineering, procurement / manufacturing, test and inspection for material handling and crushing machine, vibrating screen machine for Ore nickel for Rio Tuba HPP project |
|
JGC - Yokohama |
|
| |
064. |
Design, engineering, procurement, instalation, test and commissioning for MAP-I project |
|
MAP - I |
|
| |
063. |
Supply and installation 1000 KVA power generating system |
|
PT. Adiwira Presisi Industri |
|
| |
062. |
Partial engineering, procurement / manufacturing, instalation utility system for utility for upgrading coal pilot project |
|
Tekmira / Kobe Steel |
|
| |
061. |
Engineering, procurement / manufacturing, instalation, test and commissioning for reactor, pressure vessel heat exchanger, storage area, vacuum ejector, chemical pump, chiller and cooling system, cooling tower system, piping and utility for plant expansion |
|
PT. Indopherin Jaya |
|
| |
060. |
Feasibility study for coal liquefaction plant (BCL Project) |
|
Kobe Steel - Japan |
|
| |
059. |
Engineering, procurement / manufacturing, test, inspection and installation supervision for conveyor system (9 lines) for cable manufacturing |
|
PT Surabaya Autocomp Industries |
|
| |
058. |
Engineering, procurement / manufacturing, inspection, packing and delivery for belt conveyor for coal handling Maisuru Power Plant - Japan |
|
Kawasaki Plant System |
|
| |
057. |
Engineering, procurement / manufacturing, instalation, test and commissioning for thermal oil boiler and heat system |
|
PT. Indopherin Jaya |
|
| |
056. |
Engineering, procurement / manufacturing, instalation, test and commissioning for resin & dryer plant expansion |
|
PT. Aica Indonesia |
|
| |
055. |
Engineering, procurement / manufacturing, test and commissioning for melamin plant expansion |
|
PT. Aica Indonesia |
|
| |
054. |
Basic study for fine coal briquite |
|
Kobe Steel - Japan |
|
| |
053. |
Engineering, procurement / manufacturing, test and inspection, supervising of installation for rotary dryer system and bag filter for toyota bio fodder plant project |
|
Tsukishima Kikai Co., Ltd |
|
| |
052. |
Engineering, procurement / manufacturing, test and commissioning for pulverizer system Expansion project (bag filter, conveyor system, pressure vessel, pump, utility and others) |
|
PT. Indopherin Jaya |
|
| |
051. |
Engineering, procurement / manufacturing, test and inspection, installation supervising for bag filter for Philiphina coal plant |
|
Hashimoto Sangyo - Japan |
|
| |
050. |
Engineering, Procurement / manufacturing, test and commissioning for phenol plant expansion project |
|
PT. Aica Indonesia |
|
| |
049. |
Design and engineering, procurement and manufacturing, test and inspection for polluted soil renewal equipment |
|
Sumitomo Metal Mining - Japan |
|
| |
048. |
Design and engineering, procurement / manufacturing, installation, test and commissioning for waste water treatment plant |
|
PT. NBC Indonesia |
|
| |
047. |
Design and engineering, manufacturing, installation, test and commissioning for gas scrubber (H2S) for toshiba plant |
|
PT. Taikisha Indonesia |
|
| |
046. |
Basic study for BCL-project (coal liquification) |
|
Nisso Iwai - Japan |
|
| |
045. |
Electrical distribution work for NaOH new plant |
|
PT. Asahimas Chemical |
|
| |
044. |
Design and engineering, procurement and manufacturing, test and inspection, installation supervising for bag filter for MBS-III Plant Singapore |
|
Mitsui Chemical Co.,Ltd |
|
| |
043. |
Design and engineering, procurement and manufacturing, test and inspection for agitator system |
|
PT. Hanwa Chemical |
|
| |
042. |
Pickling waste water treatment |
|
K.K Nakamura - Japan |
|
| |
041. |
Design and engineering, procurement / manufacturing, test and inspection for Incinerator |
|
PT. Bayer |
|
| |
040. |
Design and engineering, procurement and manufacturing, test and inspection for dust collector system |
|
Mitsui Co. Ltd |
|
| |
039. |
Design and engineering, procurement and manufacturing, installation, test and commissioning RHK pallet handling system |
|
PT. Sumimagne Utama |
|
| |
038. |
Partial design, procurement / manufacturing, test and inspection for GP powder furnace |
|
PT. Indac International |
|
| |
037. |
Design and engineering, procurement / manufacturing, installation, test and commissioning for muffle furnace |
|
PT. Sumimagne Utama |
|
| |
036. |
Design and engineering, procurement and manufacturing, installation, test and commissioning for 3 sets of ball mill for grinding material |
|
PT. Sumimagne Utama |
|
| |
035. |
Design and engineering, procurement and manufacturing, test and inspection for dust collector for NPK Project- Petrokimia Gresik |
|
PT. Rekayasa Industri |
|
| |
034. |
Design and engineering, procurement / manufacturing, installation, test and commissioning for low voltage equipment |
|
Sumimagne Utama |
|
| |
033. |
Design and engineering, procurement and manufacturing, installation, test and commissioning for 20 KV electrical distribution, expansion factory |
|
Sumimagne Utama |
|
| |
032. |
Filter press for WTP of Kwh meter Plant |
|
Mecbelosa |
|
| |
031. |
Design and engineering, procurement and manufacturing, installation, test and commissioningElectrical for magnet plant expansion |
|
PT. Sumimagne Utama |
|
| |
030. |
Design and engineering, procurement and manufacturing, test and inspection for dust collector for P-11 cement plant |
|
Kawasaki Plant System |
|
| |
029. |
Partial design and engineering, Procurement and manufacturing, installation, test and commissioning for Ombilin filtration water treatment plant system |
|
Ishigaki - Japan |
|
| |
028. |
Partial design and engineering, Procurement and manufacturing, installation, test and commissioning for Ferromas Smelting Furnace #6 |
|
PT. Ferromas |
|
| |
027. |
Partial design, Procurement and manufacturing, installation for ducting & platform coal bricket plant |
|
Mitsui Mining Co. |
|
| |
026. |
Maintenance factory / electrical inspection |
|
PT. Sumimagne Utama |
|
| |
025. |
Modification water treatment plant |
|
PT. SMMEP Indonesia |
|
| |
024. |
Replacement of roasting kiln |
|
PT. Sumimagne Utama |
|
| |
023. |
Design and engineering, procurement and manufacturing, installation, test and commissioning for replacement and modernization of Fe-Ni 1 (Electric Furnace, kiln segmented, electrical precipitator and others) |
|
PT. Aneka Tambang (Persero) |
|
| |
022. |
Basic design for Fe-Ni 3 smelting plant |
|
PT. Aneka Tambang (Persero) |
|
| |
021. |
Feasibility study report for chemical alumina plant in Tayan |
|
PT. Aneka Tambang (Persero) |
|
| |
020. |
Design and engineering, procurement and manufactuirng, test and inspection for coal briquette plant, conveyor, hopper, dust collector |
|
Mitsui Mining Co. |
|
| |
019. |
Procurement and manufactuirng, installation, test and commissioning for water treatment system for MM 2100 industrial park, mechanical & electrical work |
|
EBARA Corporation |
|
| |
018. |
Partial design, procurement / manufacturing for roasting kiln (SUS 310S) |
|
PT. Sumimagne Utama |
|
| |
017. |
Procurement and manufactuirng, installation, test and commissioning for material handling and stock yard conveyor system for Gresik Copper Smelter |
|
PT. Chiyoda International Indonesia |
|
| |
016. |
Partial design, procurement and manufacturing, installation, test and commissioning for water cooling & treatment system for PT. KS Wire Rod Mill |
|
Mitsui & Co., Ltd |
|
| |
015. |
Installation of billet reheating furnace for PT. KS Wire Rod Mill |
|
Mitsui & Co., Ltd |
|
| |
014. |
Lining work / wall paper hastelloy c lining duct for paiton power plant |
|
Mitsubishi Material Co., Ltd. |
|
| |
013. |
Manufacturing stainless vessels (59 items) for IBP-2 Project |
|
Toray Engineering |
|
| |
012. |
Design and engineering, procurement / manufacturing, test and inspection 21 sets of Dust Collector for new cement plant |
|
PT. Bintang Cement |
|
| |
011. |
Procurement and manufacturing, installation of local portion equipment for plant expansion |
|
Ebara Indonesia |
|
| |
010. |
FRP Lining Work |
|
Sumiden Serasi Wire Products |
|
| |
009. |
Design and engineering, procurement / manufacturing and installation of electrical work for New Factory |
|
Tomen Corporation
"Yamatogawa Shiko" |
|
| |
008. |
Maintenance Service Contract ( 7 - Contract until now)
(Ball mill lining, Electrical Inspection) |
|
PT. Sumimagne Utama |
|
| |
007. |
Rotary Kiln Retort shell Renewal (SUS 310S/Outside heating type) |
|
PT. Sumimagne Utama |
|
| |
006. |
Supply of X-ray analyzing system |
|
PT. Aneka Tambang |
|
| |
005. |
Feasibility Study Report for New Fe-Ni 3 Plant (22,000 T - Ni) |
|
PT. Aneka Tambang |
|
| |
004. |
Assistance for Field engineering (cement plant) |
|
Kawasaki Heavy Industries Co., Ltd |
|
| |
003. |
Market Research |
|
Kurimoto Iron Works Co.,Ltd |
|
| |
002. |
Manufacturing and installation annealing furnace & handling manipulator |
|
Taiho Engineering Co.,Ltd. |
|
| |
001. |
Design and engineering, procurement / manufacturing, installation, test and commissioning waste water treatment system
(Cyanide Waste Water, 80 m3/day) |
|
PT. SMMEP Indonesia |
|